Last Update: Jul. 28, 2009
| Title | Name | Assignement |
|---|---|---|
| Head | Atsushi HATTORI | General Management |
| Senior Researcher | Mitsunori IINO | Adaptation for Flood caused by Climate Change, Technical Criteria for River Works(Designing) |
| Senior Researcher (Climate Change Research Team) |
Yoshito KIKUMORI | CommonMP, X-Band MP Radar, Estimation of External Load regarding Climate Change, Damege Detection Technologies, Data Sensing |
| Senior Researcher | Fumito BITO | Technical Criteria for River Works(Surveying), Flood Risk Estimation for Climate Change |
| Researcher | Keiichi ONODA | Adaptation for Flood caused by Climate Change |
| Researcher | Yoshinori TAKEUCHI | Overall Sediment Control, River Channel Control, Design Method of Revetment |
| Researcher | Hirotsugu NOBUTSUNE | Disaster Survey, Maintenace and Operation, River Levee Geophysics |
| Researcher | Naoki FUKUHARA | Disaster Survey, Maintenace and Operation, River Levee Geophysics |
| Associate Engineer | Seiji OCHIAI | Disaster Survey, Maintenace and Operation, River Levee Geophysics |
| Associate Engineer | Keita SATO | River Channel Control |
| Associate Engineer | Tomomi TERASAKI | Data Sensing, Damage Detecting Technologies |
| Part-Time Staff | Sayaka IGARASHI | Secretarial Assistance |