2007.4-2008.3 Yearbook of NILIM
Research Summary
River Department
Reference Number | Y070308 |
Title | Research on the Improvement of Flood Control by Dams in Flood Exceeding the Designed Level |
Start-End Date | 2005.4-2008.3 |
Division | Water Management and Dam Division |
Author | Head, Nario YASUDA Senior Researcher, Atsushi HATTORI |
Summary | In this study, the exceedance probability of design high water level for the river training plans with or without flood control facilities was estimated as a function of the return period of rainfall depth. The results show that both plans securing the discharge capacity up to and including design high water discharge are not equivalent in terms of the exceeding probability. |